Pyramid undertakes detailed engineering activities based on FEED, Schedule ‘A’ or basic engineering for developing designs and documents for procurement and construction. Our integrated multidiscipline engineering team involves extensive interaction of Process, Mechanical, Piping, Civil, Electrical and Instrumentation engineers and our deliverables are aimed at arriving optimum quantities and work-volumes while ensuring the constructability, operability, maintainability and safety of the plant. Our multi-disciplinary engineering efforts are greatly facilitated by the extensive computerization and importantly, the 3D modeling approach utilizing the latest tools such as PDMS and PDS.
| INSTRUMENTATION |
|
Instrument Data Sheets and Index |
|
Logic Development and preparation of Cause & Effect diagrams |
|
DCS/PLC engineering & I/O List |
|
Preparation of Field Instrument and control panel specifications |
|
Preparation of inter lock diagrams and loop drawings |
|
Preparation of JB and cable schedule |
|
Layout for Instrument / JB / Cable trays for Field & Control room |
|
Installation, mounting and hook up drawings |
|
F&G & PA System |
|
Communication Network Design |
|
Preparation of Air and Power distribution scheme |
|
Sizing of Relief Valve / Control valve / orifice plate |
|